• Fort Peck, MT
  • 10,650 sq.ft.

Fort Peck Theater’s exterior wood siding and moldings on this circa 1943 historic structure had deteriorated substantially; beyond repair in many cases. With the aid of the original construction drawings from the Army Corp of Engineers we were able to replace all of the missing moldings exactly to their original specifications. As part of the restoration we also reestablished the original exterior colors.

The entire electrical system was also replaced and upgraded to provide safe, adequate power and service for the new stage lighting, dimmer system, and sound system required for the summer theater program.